1, bid notices and construction permits
2, the construction contract
3, commissioned by the Commissioner of project supervision contract
4, the construction plan review and written approval of construction plans review
5, Quality Supervision and registration book
6, elements of quality control tests and quality control program of work
7, geotechnical engineering investigation report
8, construction drawing Mixed record
9, by the Commissioner (or owners) to approve the construction design or construction program
10, started reporting
11, Quality Management System Registration Form
12, construction on-site quality control inspection records
13, technical tests, records
14, measurement positioning record
second part of the inspection data quality
1, ground tank inspection records
2, pile construction quality inspection reports
3, ground treatment project quality inspection reports
4, ground-based division of engineering and quality inspection reports
5, main structure of the division of engineering quality inspection reports
6, a special division of engineering quality inspection reports
7, line laying and inspection reports
8, foundation and foundation division and sub-divisions contained, sub, test batch quality inspection records
9, the main structure contained in sub-division and division, sub, quality acceptance inspection lot record
10, decoration contained in sub-division and division, sub, quality inspection lot inspection records
11, the roof segment and contains sub-divisions, sub, quality acceptance inspection lot record
12, water supply, drainage and heating division and contain sub-divisions, sub, quality inspection lot inspection records
13, Electric Division and contains sub-divisions, sub, quality acceptance inspection lot record
14, Intelligence Division and contains sub-divisions, sub, quality acceptance inspection lot records
15, ventilation and air conditioning division and contain sub-divisions, sub, quality acceptance inspection lot record
16, the elevator division and contain sub-divisions, sub, quality acceptance inspection lot record
17 , the unit works and sub-units contained in completion and acceptance of project quality records
18, outdoor projects division (sub-division), sub-items, quality acceptance inspection lot records
third part of the test data
1, cement physical performance test report
2, sand, stone inspection reports
3, the intensity level of the concrete mix test report
4, strength of concrete specimen tables, assessment form and test report
5, the intensity level of the mortar mix test report
6, mortar strength tables and specimen test report
7, brick, stone, block strength test report
8, steel mechanics, bending performance test report and steel welded joint tensile, bending test reports or inspection reports reinforced mechanical connection joints
9, tendons, wire strand entering the mechanical properties of re-inspection report
10, pile foundation engineering test report
11, steel structure engineering test report
12, curtain wall engineering test report
13, waterproof material test reports
14, metal and plastic outer doors, windows test report (including materials and three sex)
15, decorative brick wall of pulling strength test report
16, construction (structures) lightning device acceptance test report
17, there are special requirements or design requirements of the backfill density test report
18, Quality Acceptance of the other test reports
19, basement waterproofing inspection records
20, with waterproof ground water test records required
21, roof water spray test records < br> 22, the exhaust (air) Road inspection records
23, energy saving, insulation test records
24, piping, equipment, strength and leak test records
25, system cleaning, irrigation, water, communication ball test records
26, lighting full load test records
27, large light fastness test records
28, electrical equipment commissioning records
29, electrical engineering grounding, insulation resistance test records
30 , refrigeration, air conditioning, pipe strength and leak test records
31, refrigeration equipment, test run debug log
32, ventilation and air conditioning system commissioning commissioning records
33, air flow, temperature test records
34, out of the box elevator equipment inspection records
35, elevator load test, safety devices, inspection records
36, lift ground, insulation resistance test records
37, the lift test run debug log
38, Intelligent Building engineering system test run record
39, intelligent building systems and equipment function test debug log
40, units (sub-unit) engineering safety and functional testing and other necessary measuring, testing, testing, inspection, testing, debugging , the fourth part of the test run record
materials, products, components, fittings and other certificate information
1, cement factory certificate (including 28 days reinforcing report)
2, brick, block factory certification
3, reinforced, prestressed, steel wire, strand, sleeve factory certificate
4, steel piles, precast concrete piles, prestressed concrete pipe factory certification
5, steel engineering components and accessories, materials, factory certification
6, curtain wall accessories, materials, factory certificate
7, waterproof material factory certification
8, metal and plastic doors and windows factory certification
9, electrode and flux factory certification
10, precast, ready-mixed concrete certification
11, to drainage and heating engineering materials factory certification
12, electrical engineering materials, equipment, factory certification
13, ventilation and air conditioning engineering materials, equipment, factory certification
14, elevator engineering equipment factory certificate
15, smart construction materials, equipment, factory certification
16, construction and other certification requirements
fifth part of the construction process information
1, design changes, negotiation records
2, engineering survey, put the line record
3, pre, self-inspection, mutual inspection, the transfer of inspection records
4, construction (structures) settlement observed measurement record
5, new materials, new technologies, new processes of construction records
6 christian louboutin men, concealed work record
7, construction of log
8, concrete opening report
9, concrete construction records
10, the concrete mix measurement sample record
11, project quality accident report card
12, project quality accident and cause of the accident investigation and handling of records
13, project quality rectification notice
14 , partial suspension of the construction project notice
15, quality of the project report and return to work the rectification application
16, works resumed notice
sixth part of the necessary information should be added
1, survey, design, supervision and construction (including sub) units of the qualification that
2, construction, survey, design, supervision and construction (including separation) unit changes and the reasons for replacement
3, survey, design, supervision and the qualifications of practitioners units that
4, construction (including subcontractors) and the types of units on-site sales management posts for skilled workers that
5, the construction unit (the owner) agreed to approved supervision plan or supervision of the implementation details
6, units stationed at the construction site to witness the power of attorney or power of attorney on behalf of the design
7, design units stationed at the construction site design on behalf of power of attorney or power of attorney
8, Other
seventh part of the completion data
1, the construction unit project completion report
2, completion of the project quality supervision unit evaluation report
3, survey documents and survey unit of the implementation of the inspection report
4, the design and implementation of design documents, unit inspection reports
5, the quality of construction completion and acceptance of submissions or units (sub-unit) completion and acceptance of project quality records
6, completion and acceptance of problem rectification notice
7, completion and acceptance of problem rectification acceptance submissions
8, the project completion and acceptance of conditions with the notice and notice of completion and acceptance of re-organization
9, unit (child unit) project quality control data verification records (quality assurance review of data records)
10, units (sub-unit ) project safety and function test data verification and the main function of random records
11, units (sub-unit) projects perception of quality inspection records (perception of quality assessment form)
12, direct marketing or commercial fund-raising staff views of residential users sign Table
13, project quality warranty contract (the book)
14, construction completion inspection report (completed by the construction unit)
15, built drawings (including Intelligent Building Division)
Construction Engineering Quality Supervision archives
1, construction engineering quality supervision registration book
2, examination and approval of construction drawings and construction drawings review
3, unit engineering quality supervision program
4, construction engineering quality supervision tests, notices of meetings books and tests, points
5, construction engineering quality supervision records
6, construction quality management system registration form
7, the construction site quality control inspection records
8, foundation, pile construction quality supervision and acceptance Check the notice
9, ground tank inspection records and pile construction quality inspection reports
10, foundation, pile construction quality inspection records
11, design units issued (or recognized) foundation and foundation treatment measures process engineering quality inspection reports
12, foundation and foundation division of engineering quality supervision and inspection and acceptance notices and inspection reports
13, ground-based division of the project quality verification and record
14, the main structure of the division of engineering quality Notice of acceptance inspection and supervision and inspection reports
15, the main structure of the division of engineering quality inspection records
16, a special part of the project quality supervision and inspection and acceptance notices and inspection reports
17, line laying project quality supervision and inspection and acceptance notices and inspection reports
18, steel, mechanical, performance, inspection reports and bending steel welded joint tensile, bending and inspection reports
19, prestressing tendons, wire strand entering the re-inspection report on the mechanical properties of < br> 20, cement physical performance test report
21, strength of concrete specimen tables, rating scale test report
22, assembled or prefabricated structural performance test certificate and construction joints, concrete patchwork bear the full construction All full strength when the specimen test report
23, waterproof concrete christian louboutin babel boots, sprayed concrete compressive strength, permeability test report and test report force bolt anti-aside
24, foundation and foundation treatment works in various types of composite after the completion of foundation construction foundation strength (bearing capacity) test results
25, Pile Foundation piles test reports
26, mortar strength tables and specimen test report
27, brick, stone, block strength test report
28, construction materials, hazardous materials and indoor environmental inspection report
29, waterproofing materials (including water-stop sealing of joints and materials), thermal insulation and sealing materials for re-inspection report < br> 30 ghd iv styler hair straightener, metal and plastic exterior doors, windows re-inspection report (including materials, pressure resistance, gas permeability, water permeability)
31, decorative brick wall of pulling strength test report
32 , various types of elevators, escalators, moving walkways installation of the machine installation inspection report
33, various types of equipment installation and acceptance of the hidden, system linkage, system debugging and installation inspection records
34, the concrete floor panel thickness of the drill sampling record
35, project quality accident report card
36, project quality and project rectification notice to suspend the construction of local notice
37, project quality and project quality submissions resumed resumption notice
38 units (sub-unit) project quality control data verification records (quality assurance review of data records)
39, units (sub-unit) engineering safety and function test data verification function checks and major record
40, units ( sub-unit) projects perception of quality inspection records (perception of quality assessment form)
41, the construction unit project completion report
42, completion of the project quality supervision unit evaluation report
43, survey documents and survey unit inspection report on the implementation of
44, the design and implementation of design documents, unit inspection reports
45, construction completion inspection report
46, engineering supervision and inspection of final acceptance notice
47, quality assurance data verification records
48 unit (sub-unit) project completion and acceptance of quality records (quality of the project completion and acceptance of submissions)
49, re-organize the final acceptance notice
50, completion of the project retest submissions
51, the completion and acceptance problems rectification notice and acceptance of submissions rectification problems
52, project quality warranty contract
53, units (sub-unit) engineering quality supervision report
Note: curtain wall, steel structure and set of grid data storage quality supervision station